Header
back to list

Phase III, day 5, 20:27

Frank | 24 August 2007 - 8:27 PM

The set looks wonderful. Hanno and Peter, our construction guys, did a marvelous job again ! For 6 weeks they were here in this dirty, cold and moist place, working it into our control room set. The 4K HMI light is set up from above, through the girder in the ceiling´s opening, the rest has been prepared some days ago with me hanging under that high ceiling, prepping small light fixtures (Dedolights, 650w and Peppers mostly) to light some details and bring structure into the walls. Nothing of this looks “low budget”. The console with all the screens, the walls, the background with the two “mainframe computer” props. People are looking into the video feed monitor excitedly. We really got some serious production value here !





back to list