Header
back to list

Phase III, Day 4, 23:45

Frank | 23 August 2007 - 11:45 PM
2007-08-23_at_23-40-57

The bridge

The crane is set up. Due to the fact I´m director, d.p. and cameraoperator on this project, I have to climb it myself again. Jens Fisher is at my side, as usual. We´re pretty used to spend hours and hours on this crane, like so many times before on all kinds of different productions, but this time is the first time we kind of feel a bit funny up here. Might be because the crane is about 5 m in height on a bridge which is about 7 meters high. Together, this makes 12m. Makes us feel a bit uncomfortable looking down. Especially when Hanno, our crane operator, is swinging the thing over the bridges railing, which he must to achieve the shot I want.





back to list