We arrive on set, a huge hall in an old factory facility we rented as our studio faciöity for the cell scenes. Lots of space, dry and mostly clean for the shoot, the only existing problem are a couple of pigeons living here and making their usual sounds we got used to during the set´s construction. I hope they won´t cause to much problems with our sound recording. Hanno Gerken and his construction, paint and aging crew, mainly Peter Vonderstein, Ralf Burmster and Andrea Münzberg, did a marvelous job on this one again ! Our prison cell looks fantastic. The contruction guys spent the majority of the last three weeks here, putting together a flexible wall system, needed by the camera to get all the angles needed. They appear as brick and steel walls, but everything is made of wood, carefully altered and aged by Ralf Burmester´s team. A toilet has been added and our set dresser, Dominik Schmitz, even got a original prison bunk bed from a real prison !







